![]() ![]() In principle, the inspection results can be directly captured in the BIM using photogrammetry or some other procedure. The evaluation of the reliability or safety/serviceability would be therefore possible quasi, on-the-fly within the future BMS, provided that the observations and results from SHM can be adequately integrated in BIM. Apart from exact semantic and spatial specification, BIM can embed realistic structural system of a bridge as well as the relevant load situations. These models can and will be included into the Bridge Management System (BMS) and will significantly enhance the quantity of useful information in future BMS. ![]() P>It is foreseeable that in not so distant future, Building Information Models (BIM) of both newly built and existing bridges will be available. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |